Fit out Nuclear Medicine room for PRP Diagnostic Imaging at Maitland

Works started with demolition of existing partitioning and flooring, disconnecting existing electrical and sink. We then moved onto building partitions, installing electrical, finishes, plumbing and air conditioning. Joinery was manufactured and installed by our inhouse team of cabinet makers.

About The Client

PRP Diagnostic Imaging at Maitland

November 2016

  • Demolition of existing partitioning and flooring, disconnecting existing electrical and sink
  • Building partitions, installing electrical, finishes, plumbing and air conditioning
  • Joinery was manufactured and installed by our inhouse team of cabinet makers